From Sample to Container: The Squishy Production Timeline Importers Should Plan For

Published 2026-09-06 on request · by Seajoy Squishy team

From Sample to Container: The Squishy Production Timeline Importers Should Plan For — squishy wholesale guide

Step 1 — brief and quote

Shape, texture, packaging tier and target retail price. A complete brief gets a complete quote; a photo alone gets a guess.

Step 2 — sample

Existing designs ship fast; custom shapes need a mould first. Ask for photos and a squeeze video before the sample ships so you can reject early.

Request FOB Quote

Step 3 — approval locks the standard

The approved sample becomes the production reference for colour, rebound and packaging. Changes after approval restart the clock.

Step 4 — testing

Third-party testing to ASTM F963-23 and CPSIA runs in parallel with production; the CPC is issued when reports are in. Book the lab early.

Step 5 — inspection and shipment

Batch inspection covers rebound time, seam strength, print alignment, odour and packaging. FOB China main port; sea freight to the US West Coast is typically 30–45 days port to port.

Request FOB Quote

Where delays come from

Late artwork for packaging, colour changes after approval, and lab backlogs before peak season. Plan 90 days from brief to FOB for a new design.